Shower remodel · Fort Worth
Shower remodels in Fort Worth
We take a shower down to the studs and rebuild it: the pan, the waterproofing, the walls, the valve and the glass.
New tile or a new shell over the old shower changes how it looks. It doesn’t fix the waterproofing behind it.
Or call or text (817) 631-9803
A shower from a primary bath we took down to the studs, in Arlington Heights.
What it costs with us
Shower remodel cost in Fort Worth
We price a shower from your house after we walk it, because the drain, the pan and the walls decide the work. When the shower comes out with the rest of the room, here’s what each kind of bathroom runs with us.
A hall, guest, kids’ or powder bath, taken down to the studs and rebuilt
$20,000 – $55,000
A primary bath, about 100 square feet at the low end and closer to 190 at the top
$63,000 – $120,000
Both are construction plus our fee, before permits and contingency.
From the pan up
What a shower remodel rebuilds
A shower is built in layers, and the ones that keep water where it belongs are the ones you never see. We take a shower down to the studs, and these are the six layers that go back in.
-
The drain.
Where it sits is the first decision. Moving a drain is a floor-structure job, not a plumbing job.
-
The pan.
The shower floor, sloped to the drain.
-
The waterproofing.
It runs under the floor tile and up the walls behind it.
-
The valve.
The valve sits in the wall behind the handle. If it’s old, replace it while the wall is open.
-
The walls.
Tile, or a single sheet of porcelain with no grout lines. Plan the shower niches and a bench with the layout.
-
The glass.
You look at a shower enclosure every day. The cheap version looks cheap, and a well-specified frameless one nearly disappears.
A curbless walk-in shower is a beautiful feature and a technical project. Done right, the slope, the linear drain, the waterproofing membrane and the floor transitions work together.
Four things decide it
What decides what a shower remodel costs
Once we’ve walked your shower, four things decide where your price lands.
-
Whether the drain moves.
Leaving the drain where it is keeps you lower in a range; moving it is a floor-structure job and usually the difference between the two ends.
-
What’s behind the tile.
A soft wall or a failed pan means more comes out. Some of this only shows up once the floor or wall is open. That’s what contingency is for.
-
What the walls are made of.
Tile, a single porcelain sheet, niches and a bench each change the work on the walls.
-
What you finish it with.
Finish level, which is the lever you control most. Stock vanity and porcelain against custom millwork, stone and frameless glass is most of the spread once the plan is settled.
Shower or the whole room
When a shower remodel becomes a bathroom remodel
A shower shares its floor, its pipes and often its tile with the rest of the room. Three things usually turn a shower job into a bathroom job.
-
The drain has to move
Moving it means opening the floor, and the floor tile around the shower comes up with it.
-
The tile runs past the shower
When the same tile covers the rest of the bathroom floor or walls, new tile in the shower means deciding about the room’s tile too.
-
It’s your only full bath
When it is, the work gets phased so the room does not go offline for a month, and phasing costs more than doing it in one run.
Trading a tub for a shower is its own project. We rebuild showers as remodels, and we don’t regrout, recaulk or swap a shower door on its own.
What the City asks for
Shower remodel permits in Fort Worth
Yes. A shower remodel replaces the pan, and in Fort Worth a new shower pan takes a plumbing permit. New tile with the pan and the walls behind it left in place is cosmetic work and doesn’t need one.
- Retiling a shower, with the pan and the walls behind it left in place No permit
- The City calls these cosmetic remodels and doesn’t require a permit for them.
- Moving a toilet or a drain, or a new shower pan Plumbing permit
- Changing, installing, moving or repairing pipes, water heaters and shower pans.
Each trade’s rough-in is inspected while it’s still open. The City requires permitted work to stay exposed until it’s inspected and approved, and it isn’t liable for the cost of opening up anything that was covered first.
On our remodels, the permits are ours to handle. When your bathroom needs one, we draw the plans and take them to the City.
City of Fort Worth, Residential Permitting. Read November 11, 2026.
How to get a price for your shower remodel
After the first walk-through you get an estimate. Once the design is done, you get a detailed budget.
-
Meet Up.
A designer and a builder come to your house, look at it with you at no charge, and give you an estimate.
-
Team Up.
We draw the shower and the room around it, pick the tile and the glass with you, and your detailed budget comes from those drawings.
-
Glasses Up.
We build it, you watch the budget as it moves, and you get back a home that feels like you.
Or see how we remodel a whole bathroom and a primary bath.
Best Home Builder & Remodeler
Fort Worth MagazineFort Worth Chamber Small Business of the Year4.7 stars from 91 Google reviews as of September 2026
How much does a shower remodel cost?
With us, a shower is priced from your house after we walk it. When it comes out with the rest of the room, a hall, guest, kids’ or powder bath taken down to the studs and rebuilt runs $20,000 to $55,000, and a primary bath runs $63,000 to $120,000. Both are construction plus our fee, before permits and contingency.
What’s the least expensive way to redo a shower?
Keep the drain where it is. Moving a drain is a floor-structure job, and it’s usually the difference between the low end of a range and the high end. New tile or a new shell over the old shower changes how it looks, and it doesn’t fix the waterproofing behind it.
Does a shower remodel need a permit in Fort Worth?
Yes. A shower remodel replaces the pan, and the City puts installing or moving shower pans and pipes under the plumbing permit. Retiling with the pan and the walls behind it left in place is cosmetic work and doesn’t need one.
Can a shower be made curbless?
It can be, and it’s a technical project. Done right, the slope, the linear drain, the waterproofing membrane and the floor transitions work together. Done casually, water finds its way out of the shower and into the rest of the bathroom.
Is frameless glass worth it?
You look at a shower enclosure every day. The cheap version looks cheap, and a well-specified frameless one nearly disappears. Price both before you decide.
Can you add a niche or a bench?
Yes. We plan the niches and the bench with the layout, before the walls are waterproofed and tiled.
Rebuild the shower you start every morning in
A shower that looks new over an old pan is still the old shower. Walk it with us, and you’ll get an estimate for rebuilding it from the pan up.
Or call or text (817) 631-9803
