Punch lists, explained

What is a punch list in construction?

A punch list is the list of small things still unfinished or not quite right when a job is nearly done. You make it on a walk-through, and everything on it gets fixed before the job is closed out.

Or call or text (817) 631-9803

Sources: Dictionary.com, Wikipedia, the Texas Property Code and the Texas Real Estate Commission, read November 27, 2026.

One of our team points up at the range hood in a finished white kitchen while a teammate notes it on a tablet.
Close-up of a fluted white-oak bathroom vanity with black pulls and a brass faucet.

The definition

What a punch list means

A punch list is a written list made at the end of a construction job. It names each thing that still needs finishing or fixing, room by room, so nothing gets forgotten before the job is called done.

The dictionary definition

an itemized list of mostly minor fixes or work to be done before final payment on a construction or repair project.

Dictionary.com, “punch list” · first recorded in 1950–55 · read November 27, 2026

What goes on one

  • Touch-ups.

    A scuff in the paint, a gap in the caulk.

  • Adjustments.

    A door that sticks, a drawer that doesn’t close straight.

  • Replacements.

    A chipped tile, a scratched fixture.

  • Anything missing.

    A cover plate, a cabinet pull, a closet rod.

An example punch list
Kitchen Drawer left of the range doesn’t close straight Adjust
Kitchen Cover plate missing behind the fridge Install
Primary bath Gap in the caulk where the tub meets the tile Re-caulk
Primary bath Chipped floor tile by the door Replace
Hall Scuff on the wall at the stair landing Touch up paint
Bedroom 2 Closet rod not installed Install

You’ll also hear it called a snag list. Same list, other name.

The timing

When the punch list happens

Near the end, when the work is nearly done. On a Texas new-home contract, that point has a name: substantial completion. The punch list is how the last of the work gets finished.

  1. 1

    The work is nearly done.

    The rooms are finished enough to walk.

  2. 2

    You walk it and make the list.

    Room by room, with the builder.

  3. 3

    The list gets worked off.

    Each item is fixed or settled, and the job closes out.

A finished primary bath vanity with brass globe sconces and brass fixtures.

The Texas Real Estate Commission’s contract for a new home being built sets that point at “the final inspection and approval by all applicable governmental authorities and any lender.” TREC No. 23-20 ¶7.E

On the City’s side, your permit closes at the building final. In Fort Worth, a house used only as a home doesn’t need a certificate of occupancy.

The difference

Punch list vs. change order vs. warranty

Not everything you find at the end belongs on the punch list. Work the contract already covers goes on it. New work is a change order. A problem that shows up after the job is done is usually a warranty question.

A punch list item, a change order and a warranty item, compared
What it is Work your contract covers that isn’t finished or isn’t rightNew work, or a change to the planSomething that goes wrong after the work is complete
When it comes up On the walk-through at the end of the jobDuring the job, when someone asks for a changeAfter the job is closed out
Who pays for it? Usually covered by your contractThe change order prices itYour warranty or your contract decides

Under Texas lien law, warranty work isn’t part of completing the contract.

What Texas lien law counts as complete

“Completion” of an original contract means the actual completion of the work, including any extras or change orders reasonably required or contemplated under the original contract, other than warranty work or replacement or repair of the work performed under the contract.

Texas Property Code §53.001(15) · read November 27, 2026

The walk-through

How to walk a punch list

Walk it with your builder, room by room, and write each thing down while you’re standing in front of it. Six habits help you catch what’s there.

Green Shaker cabinets with brass pulls, glass-front uppers and lit oak shelves.
  • Go room by room, in the same order, so you don’t skip one.
  • Open and close everything: doors, drawers, cabinets, windows.
  • Turn everything on: faucets, the shower, lights, fans, the appliances.
  • Look at the surfaces in good light: paint, trim, caulk, grout, counters.
  • Write down where each item is, and take a photo of it.
  • Agree on the finished list in writing, and keep a copy.

The last payment

The punch list and the final payment

The final payment usually waits for the punch list. Once the last check is written, a missed item can be harder to get fixed, so the list matters most right before you pay.

Final payment to the contractor is only made when all of the items on the punch list have been confirmed to meet the project-design specifications required by the contract, or some other mutually agreed resolution for each item has been reached.

Wikipedia, “Punch list” · read November 27, 2026

Two of our team in a finished custom-home kitchen with a walnut island and brass cabinet pulls.

At 6th Ave Homes

How we finish a job

We walk the house with you and create a punch list: everything that needs touch-up, adjustment, replacement, or attention before we hand over the keys.

We work through the punch list, get through the final city inspections, and give you the equipment manuals and the contacts you’ll want the first time something needs service.

Every step of a whole-home remodel, in order

Questions

Questions about punch lists

Planning a project? Talk to us before the design is set.

Who makes the punch list?

Usually the owner and the builder, walking the job together. When an architect or a designer is on the project, they may walk it too. What matters is that you’re there, and that the list is written down.

What’s another name for a punch list?

A snag list. It’s the same thing: the written list of what’s left to finish or fix at the end of a job.

Is a punch list the same as a warranty?

No. A punch list covers work that isn’t finished or isn’t right when the job ends. A warranty covers something that goes wrong after the job is done, on whatever terms your warranty or your contract sets.

What if I find something after the punch list is done?

Then it may be a warranty question rather than a punch list item. Call your builder, say what you found and where, and check what your contract or your warranty says about it.

Can I add new work to the punch list?

No. A punch list is for work your contract already covers. New work, or a change to the plan, needs a change order with its own price. Here’s how a change order works.

When is a new home in Texas substantially complete?

On the Texas Real Estate Commission’s contract for a new home being built, at the final inspection and approval by every government authority that has to approve it, and any lender. Here’s how that contract works on a new home.

How long does a punch list take?

As long as the slowest item on it. A few paint touch-ups go quickly. An item that needs a part ordered waits on the part. When you sign off on the list, ask for a date on each item.

The definitions on this page are quoted from Dictionary.com, Wikipedia, the Texas Property Code and the Texas Real Estate Commission, read November 27, 2026. This explains the terms. It isn’t legal advice about your contract.

4 years running

Best Home Builder & Remodeler

Fort Worth MagazineFort Worth Chamber Small Business of the Year4.7 stars from 91 Google reviews as of September 2026

Your project

Start with a walk-through. Finish with one too.

Bring a wish list or plans you already have, and start with an honest estimate. No charge, no obligation.

Start your project