CLICK HERE to see our FREE guides on all things real estate, interior design, and construction
6th Avenue Homes
Primary Bath Remodel in Mira Vista, Fort Worth — a completed 6th Ave Homes project

Your closet is bigger than your shower. Master Bath Remodel in Mira Vista

Our work · Mira Vista Primary Bath Refresh

Design, drawn and built

What a master bath remodel in Mira Vista involves

This is the one room worth taking on its own. Partly because you start every morning in it, and partly because in a house that has been fixed everywhere else, it is almost always the thing still waiting.

Layout, plumbing moved where the room needs it, tile and stone chosen against the floors and trim you already have, glass, lighting, ventilation that actually clears steam. Drawn by our team, built by our crew, on the same cost-plus billing as a project ten times the size.

In Mira Vista

A primary bath in a Mira Vista house is not short of square footage. The median house here is a shade over 4,700 square feet and the suite got its share. What dates is everything else about it: the 1999 finish palette, a shower detailed before frameless glass was ordinary, a tub sized for a decade that wanted one. That makes it the cleanest kind of project we do: the walls stay, the plumbing is thirty years old rather than eighty, and almost nothing behind the finish is a surprise.

A Mira Vista bath remodel by 6th Ave Homes in Fort Worth — detail 3

Design and drafting, in house

The drawings come from the people who have to build them

Plans, elevations and selections are done here, by the team that will be on site — so the thing you approve on paper is the thing that gets built, and the number under it is real.

Level two floor plan of a two-storey Fort Worth home: three bedrooms, a shared bathroom, closets and a balcony, with room dimensions

Level two

The bath drawn at 10'9" x 7'9" with the closet that feeds it, dimensioned against the bedrooms it serves — which is how you find out early whether the room can actually grow.

Three-dimensional line drawing of a primary bathroom: a double vanity with panelled cabinetry, a wide mirror between wall sconces, and a doorway through to the closet

The room in 3D

Vanity runs, mirror and sconce placement, and where the doors actually swing — drawn to scale before a single tile is ordered.

Hands holding fabric and finish swatches over a table of material samples

The selections

Held next to the floor and the trim you already have, not picked from a screen.

Renovating in Mira Vista

What the houses here actually ask for

1990s

Late-1990s and 2000s custom houses on a bit over four tenths of an acre, behind a gate, usually with a three-car garage and a pool in the back yard. Styles run traditional to Mediterranean to contemporary rather than repeating one form.

Big, structurally sound houses of a single generation on generous lots. Underneath them, the most common reading across the neighborhood is an unusual one for Fort Worth: limestone recorded as shallow as twelve inches, with low shrink-swell. So the North Texas clay-heave story is usually not the problem here. What is, is that something is in the way — and that is what prices a footing, a pier, a pool excavation or a utility trench. It is a parcel answer, and we pull yours.

Median house
4,703 sq ft

a quarter run past 5,665, and the top tenth past 6,856

Median lot
18,215 sq ft

a median frontage of 136 feet, and a recorded median lot area a shade over 0.4 acre

Houses with a pool
418 of 696

three in five, which is why the yard is usually part of the conversation

Measured from City of Fort Worth GIS and Tarrant Appraisal District parcels, measured 2026-09-02

The ground rules in Mira Vista

The city is not what governs the outside of a house here. The neighborhood is.

There's no historic overlay in Mira Vista and no Certificate of Appropriateness. What there is instead is an architectural committee written into the deed restrictions. As the record stood before the declaration was restated in January 2026, it reviewed exterior work on quality of materials and workmanship, on how a design sits against the rest of the development, and on where a structure lands on the lot and what that does to a neighbor. It's a private process with real teeth, and it runs before the city sees anything.

A-5 One-Family~65% of the land here

Minimum lot
5,000 sq ft
Minimum width
50 ft
Maximum coverage
50%
Front yard
20 ft

The committee goes first, and the city goes second

In a case the Fort Worth court of appeals decided in 2018, a builder here took plans to the city before taking them to the committee. The committee stopped the job and fined the builder for exactly that. So the order of operations is the thing to get right, and it is the opposite of the order most people assume. What we can't tell you from that record is how heavy the review runs for your particular job: the declaration was consolidated and restated in January 2026, so the current text governs, and we pull it for your lot before we draw.

Measured from City of Fort Worth GIS and Tarrant Appraisal District parcels, measured 2026-09-02; City of Fort Worth Summary of Zoning Districts; Texas appellate record, 2018; Tarrant County Clerk records

What we'd actually do here

The moves that matter in Mira Vista

Every neighborhood rewards something different. These are the three that come up on almost every master bath remodel we take on.

  1. Start with the closet, not the shower

    The suite in a house this size got a closet detailed like a spare room, because in 1999 that is what the extra footage was for. Reworking that boundary is where a real shower and a double vanity come from.

  2. The committee runs a lighter track for a remodel

    On the record, the committee has told a court it frequently omits much of the original-construction procedure for work that is not new construction. We confirm what your job actually needs before we draw, rather than assuming.

  3. Slab and glass set the schedule. The gate sets the delivery.

    A stone delivery through a staffed gate is booked, not dropped, and slab and custom glass are the two long lead times in a room this size. So the finish schedule here is a logistics decision as much as a design one.

How it works

A master bath remodel in Mira Vista, in three steps

The people who draw it, price it, and build it share a hallway — which is why the plan you fall in love with is the plan that actually gets built.

01

Meet Up

We walk the house, listen to how you actually live in it, and talk honestly about budget before anyone draws a line.

02

Team Up

Our designers and drafting team put a real plan on paper — layout, selections, and a number you can build around.

03

Glasses Up

We build it, keep you in the loop, and hand back a home that feels like you. Pour something good.

Mira Vista Primary Bath Refresh

Both numbers, one conversation

Remodel this one, or buy something newer?

Nothing here is worn out. It is a 1999 brief in a house that was built well.

What the work would cost

Priced by the people who'd build it.

Design, drafting and construction, in house.

What it'd sell for as-is

Valued by the agents who sell this market.

6th Ave Homes is a licensed brokerage.

A remodeler can price the work. An agent can price the house. We do both.

Two numbers, not an opinion. We price the remodel cost-plus, line by line, and our agents price the house as it stands against what your money buys in the newer builds west of here. Because both answers come out of the same office, neither one is a pitch for the other.

A Mira Vista bath remodel by 6th Ave Homes in Fort Worth — detail 9

Our work in Mira Vista

Mira Vista Primary Bath Refresh

Primary Bath Remodel

Nothing sets a morning back like a dated bathroom. In Mira Vista, the 6th Ave Homes team refreshed this primary bath into a space with real color and clean lines, so see what a difference it made.

See the whole project

Inside the work

The rooms, up close

Mira Vista Primary Bath Refresh: a Mira Vista bath remodel by 6th Ave Homes in Fort Worth, photo 4
Mira Vista Primary Bath Refresh: a Mira Vista bath remodel by 6th Ave Homes in Fort Worth, photo 5
Mira Vista Primary Bath Refresh: a Mira Vista bath remodel by 6th Ave Homes in Fort Worth, photo 6
Mira Vista Primary Bath Refresh: a Mira Vista bath remodel by 6th Ave Homes in Fort Worth, photo 7

Not our first time on these streets

More of our work in Mira Vista

All projects

The neighborhood

Twenty-five miles of street here belong to the neighborhood.

This was ranch land until a development group bought 625 acres of it in 1985 and Jerry L. Thomas broke ground in 1987. The name is the club's own gloss of the Spanish for see the view. It did not go up all at once: the county's records carry twenty-eight separate Mira Vista final plats on record, filed between May 1990 and October 2000. A decade of building in slices.

Read the street signs and you are reading a list of golf courses. Augusta, Baltusrol, Medinah, Muirfield, Oakmont, Pine Valley, Shinnecock Hills, Winged Foot, Troon, Turnberry, St Andrews, Cypress Point, Sawgrass, Sahalee, Harbour Town. It is the most literal thing about the place and residents are fond of it.

The streets themselves belong to the neighborhood rather than to the city — twenty-five miles of them, privately maintained — which is why a crew working here is a guest on them.

When these houses were built this was the far edge of the city. The Chisholm Trail Parkway did not open until 11 May 2014, twenty-seven years after the first shovel, and it put downtown and TCU inside a short drive of a neighborhood that had been designed as a destination. The Shops at Clearfork followed in 2017.

What's around it

  • Mira Vista Boulevard

    The spine. Most of what branches off it is named for a golf course somewhere else.

  • The greenbelt

    Ninety-six acres of it, with nature trails, a lake and a fishing dock, all maintained by the association rather than the city.

  • Chisholm Trail Parkway

    Opened to traffic in May 2014, and it's why this address stopped being remote.

  • Mira Vista Boulevard
  • Forest Highlands Drive
  • Saucon Valley Drive
  • Laurel Valley Drive
  • Lahontan Drive
  • Sanctuary Heights Road
  • Crooked Stick Drive
  • Desert Highlands Drive
  • Oak Hill Drive
  • Turnberry Drive
  • Medinah Drive
  • Troon Road
  • Cypress Point Drive
  • Sahalee Drive
  • Augusta Road
  • Sawgrass Drive
  • Muirfield Road

What that means for your master bath remodel

Nobody buys in Mira Vista and then moves because of a bathroom. They live with it, and the bath is the one room in the house that has aged at a different rate from the rest of it. We've done that room here, and the answer was in the plan rather than in the square footage.

Walk your Mira Vista house with us

Before you start

A master bath remodel in Mira Vista: the questions worth asking first

The answers that change a Mira Vista project are usually the ones nobody asks until the drawings are done. We work through these first.

“From sitting down with us in advance to walk through the process to being very timely and responsive with emails and phone calls throughout, our guide was on top of every detail. 6th Ave Homes could not have a better representative of how they want to show up in support of their clients.”
Andrew D · verified review
Can a crew get in and out through the gate?

Yes, and it is a scheduling question rather than an obstacle. The streets here are private and the guard post is staffed around the clock, so deliveries, dumpsters and trade crews all get arranged in advance rather than turning up. We handle that as part of running the job.

What if the bathroom we want is bigger than the space we have?

Then part of it is an addition. Stealing a few feet from a closet, a hall, or a bedroom is common and often enough. When it is not, a primary suite addition is a different project with a different number, and you should hear that before demolition rather than during it.

Is a fixture swap enough, or does the whole room have to come out?

If a new vanity and a paint color would fix it, we will tell you so and you should go do that. A bath we take on is a full remodel: plumbing and electrical relocated, waterproofing done properly, tile set to a plan. That is the room we are built for.

4 years running

Best Home Builder & Remodeler

Fort Worth Magazine · plus Small Business of the Year, Fort Worth Chamber

Fort Worth Magazine Fort Worth Chamber of Commerce
Two 6th Ave Homes team members sitting in a newly installed freestanding tub, laughing, against a navy herringbone tile wall

Thinking about a master bath remodel in Mira Vista?

Tell us about the house and the room that isn't working. We'll walk it with you, tell you what we'd do with it, and put a real number on it — before anyone signs anything.

Schedule a Meetup