Steps to building a pool in order, in Fort Worth

Nine steps, from the first walk-through to the water, and the pool is drawn with everything around it before anything is dug.

The order

The pool building process in Fort Worth, step by step

Plan it, permit it, build it. The pool is drawn and permitted before anything is dug, and the barrier is planned with it from the start.

Plan it

Steps 01–03

  1. Step 01: Walk the backyard with us

    We walk the backyard with you at no charge. Bring how you want to use the water and a number you’re comfortable with.

    A designer and a builder come out with no obligation, and you leave with an honest estimate.

  2. Step 02: Draw the pool with everything around it, then price it

    We draw the pool with the house, the deck, the shade and the kitchen, and put a price on paper before anything gets dug.

    We start in the yard, draw it, then check the drawing back in the yard. Grade and drainage can rule out a plan, the afternoon sun decides where people will actually sit, and a sight line from the kitchen window only shows up when you stand in it.

    After we walk your backyard you get an estimate. Once the design is done, you get a detailed budget.

  3. Step 03: Place the pool and its barrier on your lot

    City of Fort Worth

    Under the City’s residential code, a pool sits at least one foot from the house’s foundation for every foot of its depth, unless an engineer registered in Texas designs it closer. An outdoor pool also needs a barrier at least 48 inches tall.

    Pool barriers too: we draw them into the plan, so they read as part of the yard instead of an afterthought.

    Where a pool can sit, and the City’s barrier rules

Three of our team reading a large unrolled plan sheet together in a white room, one of them on the phone.

Permit it

Steps 04–05

  1. Step 04: Call 811 and get the electric company’s sign-off

    The City’s pools packet puts the call on the pool contractor or the homeowner: Texas Excavation Safety System (TESS) marks the buried lines before pool plans are submitted. 811 by phone, or Texas811.org.

    The packet says the plans must be stamped and signed off by Oncor Electric before they are submitted.

  2. Step 05: Submit the City’s pool packet

    A pool is permitted separately from any structure, and gas or electrical for an outdoor kitchen adds its own sub-permits.

    City of Fort Worth

    The packet asks for, among other things: a copy of your lot’s recorded plat; a site plan showing the front, side and rear setbacks, your neighbors’ front setbacks, the lot lines and easements, all dimensioned, with a north arrow and a scale; the construction plans; and the entrapment form, which every residential pool and spa permit needs.

    Fort Worth’s pool permit and barrier rules

Build it

Steps 06–09

A pool’s raised wall finished in glass tile and white stacked stone, before the deck is poured
  1. Step 06: The dig, the steel and the plumbing

    The pool builder digs the pool to our plan, then sets the steel and runs the pool’s plumbing.

    City of Fort Worth

    The City’s inspector checks the pool’s piping and outlet spacing while inspecting the steel.

  2. Step 07: The shell

    Then the shell goes in, and the pool has its shape.

    The pool builder builds the shell from our plan while we build everything around it.

  3. Step 08: The tile, the coping and the deck

    The tile and the coping finish the pool’s edge, and the deck meets it. The shade and the outdoor kitchen go up to the same plan while the pool is built.

  4. Step 09: The finish, then the water

    The inside of the pool gets its finish, and the pool is filled.

    City of Fort Worth

    Around an outdoor pool, the City wants a barrier at least 48 inches tall, measured on the outside, with no more than 2 inches between the ground and the bottom.

    Then you swim.

Why the order matters

What goes wrong when a pool is planned on its own

A pool planned on its own gets the rest of the backyard fitted around it later. It shows up in three places.

A new pool shell dug into a bare yard in front of a house under construction, with a tall glass wall and stone columns

The pool meets the patio

A pool has to meet everything around it: a covered patio’s roofline, the grade a deck drains to, an outdoor kitchen’s gas line. Drawn together, they agree before anything is dug.

The barrier comes last

An outdoor pool needs a barrier at least 48 inches tall, and the back of your house counts only if its doors and low windows are covered. Plan it with the pool, before the deck goes in.

The pool house decided late

Add a bathroom and somewhere to sleep and it may stop being a pool house in the zoning code and start being a secondary dwelling, which is a different permit and a different set of limits. We check that before the slab goes in, not after.

How we design a whole backyard as one plan

Time and cost

How long it takes to build a pool, and what it costs

With us, a pool and outdoor project takes 3 to 7 months.

We don’t publish a time for the pool alone; pool builds add permitting and partner scheduling.

What a pool costs in Fort Worth

With us, a pool by itself runs about $75,000 to $300,000, construction plus our fee, before permits and contingency.

The whole backyard runs $35,000 to $400,000: a covered patio or outdoor kitchen at the low end, a pool with a full outdoor kitchen and living space at the top. Budget $1,200 to $4,000 in Fort Worth permit fees for a pool and outdoor project with us.

An outdoor kitchen framed in white stone against the back of a house, its appliance openings still empty

Who runs the steps

One plan runs every step of your pool

Custom pools are built by independent contractors we partner with, not by an in-house crew. Everything around the water is ours, and it gets designed with the water rather than after it.

Do we handle permits for pools? Yes, including the required pool safety fencing and barrier codes the City enforces.

Ours
The walk-through, the design of the pool and the backyard around it, the estimate and the detailed budget, and the deck, the shade, the outdoor kitchen and the pool house.
The pool builder’s
The pool itself: the dig, the steel, the plumbing and the shell, built from our plan.

A pool builder builds pools every day, and that is exactly the job we hand them. The shell gets built to a plan that already agrees with your house, and you keep one plan and one point of contact the whole way through.

These nine steps sit under the three we name on every project: Meet Up, Team Up, Glasses Up.

Questions

Questions about the steps to building a pool

What are the steps to building a pool?

Walk the backyard, draw the pool with everything around it, and place the pool and its barrier on your lot. Then the 811 call, the electric company’s sign-off and the City’s pool packet. Then the dig, the steel and the plumbing; the shell; the tile, the coping and the deck; and the finish and the water.

What is the first step in building a pool?

Walking the backyard with a designer and a builder, so the pool gets drawn with the house, the deck, the shade and the kitchen before anything is dug. With us, that walk-through is free, with no obligation, and you leave with an honest estimate.

What does the City of Fort Worth need before a pool is dug?

A building permit. Before the plans go in, 811 marks the buried lines and Oncor Electric stamps and signs off on the plans. Then the City’s pools packet asks for your lot’s plat, a site plan, the construction plans and an entrapment form.

What gets inspected when a pool is built in Fort Worth?

The City’s pools packet names the steel inspection: the inspector checks the pool’s piping and outlet spacing while inspecting the steel. Ask the City which inspections your permit carries.

How long does each step of building a pool take?

We don’t publish a length for each step, or for the pool alone. With us, a pool and outdoor project takes 3 to 7 months. How long every kind of remodel takes

Who builds the pool shell?

A partner pool builder, from our plan. Everything around the water is ours, and it gets designed with the water rather than after it.

Other projects: kitchen remodel steps, bathroom remodel steps, home addition steps and custom home building steps.

4 years running

Best Home Builder & Remodeler

Fort Worth MagazineFort Worth Chamber Small Business of the Year4.7 stars from 91 Google reviews as of September 2026

Your pool

Start with your backyard

Hire separately, and four contractors build one backyard without talking to each other.

A designer and a builder walk your backyard with you, and you leave knowing where the pool can go and what it takes to build it.

Schedule your first walkthrough