CLICK HERE to see our FREE guides on all things real estate, interior design, and construction
6th Avenue Homes
A 6th Ave Homes team member reading a plan set inside the framing of an addition

Permit-ready drafting

Permit drawings
for your house

The site plan, floor plans and elevations your permit needs, drawn by our drafting team to your city’s checklist.

Or call or text (817) 631-9803

Who needs drawings

The five kinds of projects that need a set of plans in Fort Worth

Fort Worth’s residential permit application has you check one of five boxes, and the city asks for a complete set of plans with each.

New Construction

“Construction of an entirely new home or duplex from the ground up”

Addition

“Structural modification that results in an increase of floor area”

New Accessory

“Structures that are clearly incidental to the use of the principal building”

Accessory Addition

“Structural modification that results in an increase of floor area of an accessory structure”

Remodel

“Altering or Renovating a structure, whether interior or exterior, where the floor area remains the same”

Each structure gets its own application, so a new house and a detached garage behind it are two.

We draw these sets for homeowners, builders and investors, wherever the house is. You can buy the set by itself and hand it to your own builder.

Fort Worth’s checklist

What Fort Worth asks to see in your permit drawings

Fort Worth’s checklist for a new house or an addition has eleven items, from a copy of your lot’s recorded plat to a Neighborhood Empowerment Zone form, if your lot is in one.

It decides whether your set is complete, and it’s written in building-code language. Here it is in the city’s order, in plain English.

Hands turning a construction floor plan with labeled rooms, a door schedule and a window schedule
Every room labeled, and the door and window schedules (item 4), on a sheet from one of our sets.

1

Plat

A copy of your lot’s recorded plat, the map of your lot on file at the Tarrant County courthouse. Without the city’s and county’s approval stamps, a plat “has not been recorded and not accepted for permit submittal.” Most plats from 1970 on are online.

2

Survey or site plan

Your setbacks, meaning how far the house sits from the front, side and rear lot lines, plus your neighbors’ front setbacks. Lot lines and easements, all dimensioned, and a north arrow and a scale.

3

Engineered foundation plan

The city asks for one with every new residential permit. Additions over 500 square feet, special designs and post-tension plans need an engineer’s seal.

4

Floor plan

Every room labeled, window and door sizes marked or listed in a schedule, and the square footage of each floor noted. Label a room a bonus room and the city will inspect it as a bedroom.

5

Wall bracing

The wall bracing plan and the bracing method used, under section R602.10 of the 2021 International Residential Code.

6

Mechanical, electrical and plumbing plans

Mechanical: where the unit sits, duct and vent sizes, and every exhaust vent.

Electrical: every outlet and switch, GFI outlets marked, and every smoke and carbon monoxide detector.

Plumbing: pipe sizes from the water meter to every fixture, drain sizes at each fixture, sewer and vent sizes, and gas line sizes if there’s gas.

7

Elevations

Where the brick veneer goes, and every brick lintel marked, even ones from the city’s approved tables. A lintel that isn’t from those tables, or self-spanning veneer, needs an engineer’s seal.

8

Energy code check sheet

A check sheet sent in with your plans, from one of the three tools the city names: the Building Energy Codes Program, EnergyGauge USA, or IC3 used with Energy Star.

9

Lot drainage guide

The packet names this item and doesn’t describe it. Ask the city what it wants on yours before you submit.

10

Monotony diagram

A new house’s front has to differ from its neighbors’: a different number of full stories or a side-loaded garage (the city’s form lists exceptions to both), or three changes from the city’s list, such as the roofline or the front porch. Paint color doesn’t count. The city’s form also has a box for a custom home “unique to the block,” and ticking it meets the rule.

11

NEZ application or opt‑out form, if it applies

Only if your lot is inside one of the city’s Neighborhood Empowerment Zones. You either apply for the zone’s incentives or file the form to opt out.

City of Fort Worth, Submittal Requirements for New Residences and Additions, revision 05/26/2026. Read October 6, 2026. Read the city’s packet

Three city checklists

Fort Worth, Benbrook and Dallas permit checklists, side by side

Benbrook, its own city in Tarrant County, wants an engineer’s seal on the wall bracing plan, where Fort Worth asks only to see the plan. Benbrook also works from the 2018 residential code; Fort Worth uses the 2021. Dallas asks for things neither of the others does: sidewalks and utility poles on the site plan, and a yes or no on whether your plans comply with your private deed restrictions.

All three columns are for a new house, from each city’s own documents.
Fort Worth packet rev. 05/26/2026 Benbrook checklist rev. April 22, 2026 Dallas checklist rev. 09-29-2022; DallasNow guide, August 5, 2025
Residential code 2021 International Residential Code 2018 International Residential Code The “Dallas Residential Code”; the checklist gives no edition
Foundation An engineered foundation plan; an engineer’s seal on additions over 500 sq ft, special designs and post-tension plans An engineered foundation letter and plan, both sealed by the same engineer Foundation plans; a post-tensioned slab has to be engineered, with an engineering letter
Walls A wall bracing plan A wall bracing plan, sealed by an engineer Wall and roof framing plans
Site A survey or site plan showing the neighbors’ front setbacks; a copy of the recorded plat A plot plan with the square footage of the house, outbuildings and driveways; a grading plan; an erosion control plan A site plan showing sidewalks, drive approaches, utility poles and storm water inlets; an in-fill grading waiver, or a grading plan sealed by an engineer; a recorded subdivision plat less than two years old, or a certified county plat
Energy An energy code check sheet An energy code compliance report from a certified energy code professional An energy compliance form from a registered third-party energy provider, plus a green building affidavit
Only on this list A monotony diagram; a bonus room is inspected as a bedroom A code on each window and door, matching the schedule to the floor plan A yes or no on whether the plans comply with private deed restrictions; landscape trees by lot size
How you submit Online Two paper copies and a PDF; plans over 11×17 rolled Online through DallasNow; drawings full size, not reduced

Benbrook checklist, April 22, 2026 Dallas checklist, 09-29-2022 DallasNow guide, August 5, 2025

The finished kitchen and living room of a 6th Ave Homes custom home in Benbrook under a beamed cathedral ceiling

Drawn, permitted and built in Benbrook

Our team guided the project from floor planning and design through permitting, construction, and final completion.

See the Benbrook custom home

When an item is missing

In Fort Worth, the city’s timeline for first review comments starts “upon submittal of a complete permit application,” so a set that’s missing an item doesn’t start it. In Dallas, if you don’t supply a missing item within five working days of the city’s notice, your application may be “delayed and eventually discarded,” and the resubmittal goes in as a new application, “processed in the order of receipt.” Either way, your permit is held up, and so is your build. A set drawn to your city’s list from the start keeps our part of it from being the missing item.

Two 6th Ave Homes team members hold up a sheet of a plan set inside a house in framing, one pointing up at the floor trusses

How it works

How our drafting team draws your set

In three steps, from your address to a permit‑ready set.

  1. Send the address and what you’re building

    Tell us if it’s a new house, an addition or a remodel. If you have a copy of the lot’s recorded plat or a survey, send it too. If your house has no drawings, we draw its existing floor plan first.

  2. We draw your set

    We draw it in‑house. A standard set has a site plan, existing and proposed floor plans with door and window schedules, a demolition plan, the electrical layout, elevations and 3D views. The same team draws the houses our own crews build, so it knows what a house costs to build.

  3. Your set goes to the city

    The structural work, the foundation plan included, comes from a licensed outside engineer, who seals what your city wants sealed, and we coordinate it into your set. We don’t stamp structural work ourselves. Around Fort Worth, we handle getting your plans to the city.

Weighing whether you need an architect instead? We wrote out what Texas law says. 

Building outside the Fort Worth area? Here’s how we draw for a house we never visit. 

Still settling the layout? Start with Fort Worth floor plans. 

Cost and time

What a permit set costs and how long it takes to draw

Our drawing fee runs $2,000 to $16,000: a simple single-room set at the low end, a full permit-ready set for a large, high-end build at the top.

What moves it
Whether the set has to be permit-ready. Drawings that go to the city carry detail that a design study does not.
What isn’t in it
Structural engineering. A licensed outside engineer does it, and that fee is separate from ours. On our last two ground-up builds, the outside engineers’ fees ran about $10,000–$15,000 each.
How long
Drawing takes 8 weeks to 6 months. The bigger the project, the longer it takes. The city’s review and its permit fee are separate, and the city sets both.
A level-one construction floor plan with labeled rooms, square footages and marked door and window sizes
Level one of a new-house set from our drafting team.
4 years running

Best Home Builder & Remodeler

Fort Worth MagazineFort Worth Chamber Small Business of the Year4.7 stars from 91 Google reviews as of September 2026

Common questions

Questions about permit sets and city review

City checklists change. Each one on this page is dated, and the city’s latest version is the one your set is checked against.

What drawings are required for a building permit? Three city checklists

For a new house, Fort Worth, Benbrook and Dallas all ask for the same core set of building permit drawings: a site or plot plan, a foundation plan, floor plans with door and window sizes, elevations, and a wall bracing or framing plan, plus an energy code check sheet or report. Each city adds items of its own, so the checklist of the city reviewing your house is the one that counts.

What drawings do I need for a home addition permit? Fort Worth packet, item 3

In Fort Worth, home addition drawings go in on the same checklist as a new house: the city’s Submittal Requirements for New Residences and Additions. Its foundation item asks for an engineered foundation plan with every new residential permit, and plans sealed by an engineer on an addition over 500 square feet. A detached garage goes in as a new accessory, on the city’s accessory checklist.

Do I need permit drawings for a remodel? Fort Worth remodel checklist

Usually, yes, with a shorter list. Fort Worth’s remodel checklist, revised 05/27/2026, asks for a floor plan of the house as it is and as it will be, plus mechanical, electrical and plumbing plans if those systems change. A shingle-only reroof needs no permit. The “as it is” plan is called an as-built, and our drafting team draws those too.

What’s the difference between permit drawings and construction drawings? Fort Worth packet, “Plan Examples”

For a house, the city reviews the construction drawings themselves. Fort Worth’s packet asks that construction documents be “of sufficient clarity to indicate the location, nature and extent of the work proposed.” So the sheets our drafting team draws for your permit, together with the engineer’s structural sheets, are the set your house gets built from.

Can I draw my own plans for a building permit? Who can apply

In Texas, for a house, yes. The state’s architect law exempts plans for a single-family house. Who can apply is a separate question: in Fort Worth, a registered building contractor, or a homeowner with a homestead exemption on the house they live in. The items the city wants engineered or sealed still need an engineer, whoever draws the rest.

Is the city’s permit fee included in the price of the drawings? Fees

No. The permit fee is the city’s, and it’s separate from what you pay for the drawings. In Fort Worth, permit fees on our own projects run $1,200 to $3,500 for an addition, $800 to $2,500 for a garage apartment, and $3,000 to $5,000 for a new custom home. Other cities set their own.

Is the structural engineering included in the price of the drawings? Engineering

No. Our drawing fee covers what our drafting team draws. The structural items, such as Fort Worth’s engineered foundation plan, come from a licensed outside engineer whose fee is separate, and we coordinate that work into your set. On our last two ground-up builds, the outside engineers’ fees ran about $10,000–$15,000 each.

How long does the city take to review permit drawings? Review times

Each city sets its own. Fort Worth’s standard is 7 business days to first review comments on a complete application, and comments can mean revisions. Benbrook asks you to allow at least 10 working days for review. Dallas’s new-home checklist doesn’t state one, but its DallasNow guide describes RSVP, an expedited plan review for qualifying new single-family projects, meant to “facilitate the issuance of new single-family permits the same day the permit application is submitted and paid.” RSVP has its own fee.

Why do permit drawings get sent back? DallasNow guide, August 5, 2025

Dallas puts its most common reasons in writing. Its guide to applying for a new-home permit, dated August 5, 2025, lists four reasons plans are “commonly rejected or delayed”: “Revisions are not returned in a timely manner,” “Dimensional controls are missing,” “Summary table missing or incorrect” and “Topography lines missing.” Three of the four are about what’s drawn on the plans; the first is about how quickly revised plans go back to the city.

My address says Fort Worth. Is Fort Worth my permit office? Westover Hills

Not always. Westover Hills is its own town, and its own permit application gives the town’s address as Fort Worth, Texas 76107. A Westover Hills project is permitted by the Town of Westover Hills, not the City of Fort Worth, and the town asks for two copies of the construction plans and specifications.

Four 6th Ave Homes team members talk over a plan set on a sawhorse table inside a house in framing

Get started

Start with the address and what you’re building

Send both, and we’ll price a permit set drawn to your city’s list. The goal is a permit issued on your set, and a build that runs from the same sheets the city reviewed.

Get your permit set drawn